References

Our work speaks through the vessels we’ve built, repaired and modernised across the world. Here you’ll find a selection of projects that highlight our technical capability, attention to detail and commitment to quality.
Technical Retrofit

Polar Discovery

2025
South Korea (Samkang Shipyard, Drydock)

Completed propulsion and rudder control system retrofit, including removal of obsolete components, new cable routing and installation, equipment mounting, cable termination, labeling, and loop testing to ensure reliable signal integrity and safe vessel operation.

Technical Retrofit

Polar Endeavour

2025
South Korea (Samkang Shipyard, Drydock)

Removed outdated propulsion control components and installed new system equipment, including cable routing, termination, labeling, and loop testing to ensure system integrity, operational reliability, and safe vessel performance.

Technical Retrofit

Polar Adventure

2024
Singapore (Sembawang shipyard, Drydock)

Removed obsolete propulsion control components and installed new system equipment, including cable routing, termination, labeling, and loop testing to ensure reliable signal integrity and safe vessel operation.

Technical Retrofit

Tallink Silja Serenade

2024-2025
Poland (Remontowa Shipyard, In Operation & Drydock)

Upgraded the integrated automation system from Selma to Kongsberg K-Chief 600, including system design, removal of legacy equipment, cable installation, equipment connection, termination, labeling, and comprehensive loop testing to ensure stable and reliable onboard operations.

New build outfitting

Ritz-Carlton Yacht Collection Ilma

2022-2024
France (Chantiers de l'Atlantique shipyard)

Installed Hi-Fog high-pressure firefighting system on this ultra-luxury cruise yacht, including pipe prefabrication, full installation, pressure testing, and commissioning, ensuring rapid and efficient fire suppression throughout the vessel.

New build outfitting

Silenseas

2022
France (Chantiers de l'Atlantique shipyard)

Installed Hi-Fog high-pressure firefighting system on this hybrid yacht-liner, including pipe prefabrication, full installation, pressure testing, and commissioning, ensuring safe and reliable operation for near-zero-emission cruising.

New build outfitting

MSC World Europa

2019-2020
France (Chantiers de l'Atlantique shipyard)

Completed turnkey Hi-Fog system installation on the LNG-powered cruise ship, including prefabrication, installation, and commissioning, supporting energy-efficient and environmentally friendly vessel operations.

New build outfitting

OE Corinthian

2024-2025
France (Chantiers de l'Atlantique shipyard)

Executed full Hi-Fog high-pressure firefighting system installation on this luxury sailing yacht, from prefabrication to commissioning, ensuring compliance with top safety and quality standards for hybrid propulsion.

New build outfitting

RCYC Luminara

2024-2025
France (Chantiers de l'Atlantique shipyard)

Installed Hi-Fog firefighting system on this next-generation superyacht, managing prefabrication, installation, and commissioning to deliver reliable, high-quality protection throughout the vessel.

New build outfitting

Substation for the Parc du Banc de Guérande

2020-202
France (Chantiers de l'Atlantique shipyard)

Executed full electrical installation for this offshore substation, including cable tray installation, cable pulling, cabinet foundations, and final connections, ensuring safe and reliable operation and full compliance with technical standards.

Technical Retrofit

Polar Discovery

2025
South Korea (Samkang Shipyard, Drydock)

Completed propulsion and rudder control system retrofit, including removal of obsolete components, new cable routing and installation, equipment mounting, cable termination, labeling, and loop testing to ensure reliable signal integrity and safe vessel operation.

Technical Retrofit

Polar Endeavour

2025
South Korea (Samkang Shipyard, Drydock)

Removed outdated propulsion control components and installed new system equipment, including cable routing, termination, labeling, and loop testing to ensure system integrity, operational reliability, and safe vessel performance.

Technical Retrofit

Polar Adventure

2024
Singapore (Sembawang shipyard, Drydock)

Removed obsolete propulsion control components and installed new system equipment, including cable routing, termination, labeling, and loop testing to ensure reliable signal integrity and safe vessel operation.

Technical Retrofit

Tallink Silja Serenade

2024-2025
Poland (Remontowa Shipyard, In Operation & Drydock)

Upgraded the integrated automation system from Selma to Kongsberg K-Chief 600, including system design, removal of legacy equipment, cable installation, equipment connection, termination, labeling, and comprehensive loop testing to ensure stable and reliable onboard operations.

New build outfitting

Ritz-Carlton Yacht Collection Ilma

2022-2024
France (Chantiers de l'Atlantique shipyard)

Installed Hi-Fog high-pressure firefighting system on this ultra-luxury cruise yacht, including pipe prefabrication, full installation, pressure testing, and commissioning, ensuring rapid and efficient fire suppression throughout the vessel.

New build outfitting

Silenseas

2022
France (Chantiers de l'Atlantique shipyard)

Installed Hi-Fog high-pressure firefighting system on this hybrid yacht-liner, including pipe prefabrication, full installation, pressure testing, and commissioning, ensuring safe and reliable operation for near-zero-emission cruising.

New build outfitting

MSC World Europa

2019-2020
France (Chantiers de l'Atlantique shipyard)

Completed turnkey Hi-Fog system installation on the LNG-powered cruise ship, including prefabrication, installation, and commissioning, supporting energy-efficient and environmentally friendly vessel operations.

New build outfitting

OE Corinthian

2024-2025
France (Chantiers de l'Atlantique shipyard)

Executed full Hi-Fog high-pressure firefighting system installation on this luxury sailing yacht, from prefabrication to commissioning, ensuring compliance with top safety and quality standards for hybrid propulsion.

New build outfitting

RCYC Luminara

2024-2025
France (Chantiers de l'Atlantique shipyard)

Installed Hi-Fog firefighting system on this next-generation superyacht, managing prefabrication, installation, and commissioning to deliver reliable, high-quality protection throughout the vessel.

New build outfitting

Substation for the Parc du Banc de Guérande

2020-202
France (Chantiers de l'Atlantique shipyard)

Executed full electrical installation for this offshore substation, including cable tray installation, cable pulling, cabinet foundations, and final connections, ensuring safe and reliable operation and full compliance with technical standards.

Legal Information
  • ITK Marine OÜ
  • Registry Code: 12137112
  • VAT Number: EE101481308
  • Established: 2011

© ITK Marine | All rights reserved.